5
50 100 150 200 250 300
t-TIME
(SECONDS)
25
80
120
150
180
200
230
255
0
T - TEMPERATURE (°C)
R1
R2
R3 R4
R5
217
MAX 260C
60 sec to 90 sec
Above 217 C
P1
HEAT
UP
P2
SOLDER PASTE DRY
P3
SOLDER
REFLOW
P4
COOL DOWN
Process Zone Symbol DT
Maximum DT/Dtime
or Duration
Heat Up P1, R1 25°C to 150°C 3°C/s
Solder Paste Dry P2, R2 150°C to 200°C 100s to 180s
Solder Reow P3, R3
P3, R4
200°C to 260°C
260°C to 200°C
3°C/s
-6°C/s
Cool Down P4, R5 200°C to 25°C -6°C/s
Time maintained above liquidus point , 217°C > 217°C 60s to 90s
Peak Temperature 260°C -
Time within 5°C of actual Peak Temperature - 20s to 40s
Time 25°C to Peak Temperature 25°C to 260°C 8mins
The reow prole is a straight-line representation of a nominal temperature prole for a convective reow solder
process. The temperature prole is divided into four process zones, each with dierent DT/Dtime temperature change
rates or duration. The DT/Dtime rates or duration are detailed in the above table. The temperatures are measured at
the component to printed circuit board connections.
In process zone P1, the PC board and component pins are heated to a temperature of 150°C to activate the ux in the
solder paste. The temperature ramp up rate, R1, is limited to 3°C per second to allow for even heating of both the PC
board and component pins.
Process zone P2 should be of sucient time duration (100 to 180 seconds) to dry the solder paste. The temperature is
raised to a level just below the liquidus point of the solder.
Process zone P3 is the solder reow zone. In zone P3, the temperature is quickly raised above the liquidus point of
solder to 260°C (500°F) for optimum results. The dwell time above the liquidus point of solder should be between 60
and 90 seconds. This is to assure proper coalescing of the solder paste into liquid solder and the formation of good
solder connections. Beyond the recommended dwell time the intermetallic growth within the solder connections
becomes excessive, resulting in the formation of weak and unreliable connections. The temperature is then rapidly
reduced to a point below the solidus temperature of the solder to allow the solder within the connections to freeze
solid.
Process zone P4 is the cool down after solder freeze. The cool down rate, R5, from the liquidus point of the solder
to 25°C (77°F) should not exceed 6°C per second maximum. This limitation is necessary to allow the PC board and
component pins to change dimensions evenly, putting minimal stresses on the component.
It is recommended to perform reow soldering no more than twice.
Recommended Reow Prole