s SIWAREX R Mounting units for BB series Instruction Manual Revision 11/2012 s SIWAREX R Mounting elements for load cells in the BB series Instruction Manual Chapter Overview Warning and Safety Terms ............................................................................... 4 General 5 1. General Conditions for Installation and Assembly ........................... 7 1.1 Lift lock ................................................................................................ 7 1.2 Overload Protection ............................................................................. 7 1.3 Guide Elements .................................................................................... 8 1.4 Load Cell Dummies ............................................................................ 10 1.5 Load Cell Handling ............................................................................. 10 1.6 Welding and Installation Work............................................................ 11 1.7 Mounting ........................................................................................... 11 1.8 Installation Surfaces ........................................................................... 12 1.10 Dismantling........................................................................................ 13 1.11 Explosion Protection .......................................................................... 13 2 Elastomer Bearing ............................................................................ 14 2.1 Technical Description ......................................................................... 14 2.1.1 Application Range ........................................................................................ 14 2.1.2 Construction ................................................................................................. 14 2.1.2.1 Elastomer Bearing Construction BB 10 - 200 kg ...................................... 14 2.1.2.2 Construction Elastomer Bearing BB 350 / 500 kg .................................... 15 2.2 Assembly............................................................................................ 16 2.2.1 Assembly Elastomer Bearing BB 10 - 200 kg ....................................... 16 2.2.2 Assembly Elastomer Bearing BB 350 / 500 kg ..................................... 19 2.3 Technical Data.................................................................................... 21 2.3.1 Function Data ............................................................................................... 21 2.3.2 Dimensions ................................................................................................... 22 Document-No.: A5E00295975A Page 2 2.4 Care and Maintenance ....................................................................... 24 2.5 Ordering Data ............................................................................................... 25 3 Combi-Mounting Unit ...................................................................... 26 3.1 Technical Description ......................................................................... 26 3.1.1 Application Range ........................................................................................ 26 3.1.2 Construction ................................................................................................. 26 3.1.2.1 Construction Combi-Mounting Unit BB 10 - 200 kg................................ 26 3.1.2.2 Combi-Mounting Unit BB 350 / 500 kg ..................................................... 27 3.2 Assembly............................................................................................ 28 3.2.1 Assembly Combi-Mounting Unit BB10 - 200 kg .................................. 28 3.2.2 Combi-Mounting Unit BB 350 / 500 kg ............................................... 32 3.3 Technical Data.................................................................................... 35 3.3.1 Function Data ............................................................................................... 35 3.3.2 Dimensions ................................................................................................... 36 3.4 Care and Maintenance ....................................................................... 38 3.5 Ordering Data .................................................................................... 38 4 Ground cable .................................................................................... 39 4.1 Technical Description ......................................................................... 39 4.1.1. Application Range ........................................................................................ 39 4.1.2 Construction ................................................................................................. 39 4.2 Assembly............................................................................................ 39 4.3 Dimensions ........................................................................................ 40 4.4 Care and Maintenance ....................................................................... 40 4.5 Ordering Data .................................................................................... 40 Document-No.: A5E00295975A Page 3 Warning and Safety Terms DANGER means, that death, severe injury to persons or damage to equipment can be caused, if the respective safety measures have not been taken. WARNING means, that death or severe injury can be caused, if the respective safety measures are not taken. CAUTION with a warning triangle means that failure to take the necessary precautions may lead to minor injury. CAUTION without a warning triangle means that failure to take the necessary precautions may lead to property damage. IMPORTANT means that failure to observe the appropriate instructions may lead to an undesirable result or condition. NOTE means a notice concerning possible advantages of conforming with the recommendation. Copyright (c) Siemens AG 2012 All rights reserved Disclaimer Circulation or duplication of this document, utilization and disclosure of its contents are not permitted as long as not explicitly approved. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. We have tested the contents of this document for compatibility with the described hardware and software. This does not exclude the possibility of discrepancies in which case, we do not guarantee the complete compatibility of this document. The information in this document is assessed regularly and any necessary corrections are included in the following revision. We are grateful for any suggestions of improvement. Siemens AG Automation and Drives Process Instrumentation and Analytics D-76181 Karlsruhe Document-No.: A5E00295975A (c) Siemens AG 2012 Subject to technical changes. Page 4 General Please read this manual before starting work! It contains important notes and data for ensuring the general safety and functionality of this device. This information will simplify the utilization of this product and will lead to more precise and secure measurement results. Intended Utilization Intended utilization means that this product is only to be utilized within the limitations defined in the technical specifications and purposes of use in this operating manual. There are no dangers associated with this device when conforming with the safety notes and the intended utilization. The fail-safe and secure operation of this device depends on proper transportation, storage, installation and assembly as well as on careful operation and commissioning. Proper operation of this device can only be ensured if the specifications provided in technical data are observed. Improper handling can cause death, bodily harm and damage to equipment. Notes on Product Liability We expressly point out that the nature of the product is described exclusively and conclusively in the sales contract. The contents of this product documentation are not part of an earlier or existing agreement, acceptance or legal relationship nor do they affect these in any way. All obligations of Siemens result from the sales contract, which also contains the full and solely valid liability agreement. The provisions concerning product liability specified in the sales contract are not extended or limited by the information provided in this document. Delivery Notes The respective scope of delivery is listed on the enclosed shipping documents according to the valid contract of sale. Please observe the instructions printed on the packaging when opening. Check that the delivered goods are complete and undamaged. In particular, compare the order number on the type plate with the order data. Qualified Personnel Qualified personnel, in regards to the safety-related information in this manual and the product itself, are persons who are familiar with the installation, assembly, commissioning and operation of this product. They must be authorized and qualified to install, put into operation and maintain devices, systems and circuits in accordance with national safety rules and regulations. Document-No.: A5E00295975A Page 5 Brand names / Trademarks SIWAREX (R) is a registered trademark of Siemens AG. The other designations in this manual may be trade marks, which if used by third parties, may infringe upon the rights of the proprietor. Document-No.: A5E00295975A Page 6 1. General Conditions for Installation and Assembly 1.1 Lift lock Lift locks prevent the head plate being lifted from the load cells or permanently mounted load cells from being overloaded by force against the measuring direction. Lift locks are necessary if there is a danger of the load platform being lifted or tipped. This is possible with light high containers or with silos that are not affixed for example. Lift locks are integrated in the combimounting units of the BB series. When using the mounting units, the lift locks should be planned constructively. A suggestion for an effective solution is shown in Fig. 1-1. The measurement X indicates the possible lift-path of the load platform. The drill hole OD must be larger than the bolt diameter Od. The movement of the load platform Fig 1-1 Suggested lift may not be hindered. lock solution 1.2 Overload Protection Overload protection means protecting load cells from loads in the direction of measurement that are too great. Forces that exceed the load limits for the load cells can also come from the side. Overload protection in the direction of measurement Load cells are normally protected against vertical overloading by placing a stop-bolt under the transmission of force. The path of measurement for the load cell is limited in this manner. On load cells with high nominal loads, the danger of accidental overloading is not so great. Any possible excessive loading can be taken into account while dimensioning the load cells. Another way of protecting load cells from overloading is in over-dimensioning the load cells. Overload protection from the side Cross-forces exist because of wind, filling procedures, acceleration or conveyor belt friction for example. If these forces exceed certain values, the load cells must be protected. The force of the weight is transferred to the load cells via elastomer bearings or oscillation bolts. These elements allow a certain amount of sideways movement of the load platform or a change in length due to thermal expansion. They generate a responsive force which centers the load platform position again corresponding with the occurring movement. This freedom of movement is expressly desired and is also required for precise weighing. If transverse forces are so high that the responsive force of the oscillation bolts or the elastomer bearings achieves the permitted limits, then safety measures are to be taken. These could be oscillation limits or guide elements (see chapter 1.3). Oscillation limits must be constructed or set so that the permitted movement, on all sides, cannot be exceeded. In Fig. 1-2, this is displayed in two examples. Document-No.: A5E00295975A Page 7 General Conditions for Installation and Assembly Limit stop Drill hole 4 Platform 2.8 2.8 Bolt Platform 4 Revision 11/12 4 4 Oscillation limiters at a permitted oscillation of 4 mm in a dual weighing platform example. Fig. 1-2 Oscillation limit example Load cells of the BB series have oscillation limits integrated in them with the combimounting units. CAUTION When using load cells with low nominal loads, overload protection are to be used, cross-directional as well, in order to protect the cells from damage. The use of load cells above the maximum working load or the maximum cross-load can lead to irreparable faults or damage to the load cells or the mounting unit. 1.3 Guide Elements Guide elements compensate for cross-forces immediately. They allow no sideways movement of the load platform. At the same time, they cannot change shape when distances change in the support points (e.g. thermal expansion). Guide element positioning is shown in Fig. 1-3. They are used if the weight must be determined under the influence of a transverse force. Guide elements must be constructed perpendicular to the effective direction of the load cells so that there are no force components in the direction of measurement. Stretching the guide elements is best avoided when they are positioned with the same direction of rotation. To fasten a loading platform or a container in a static position, three guide elements will suffice. With four guide elements, there is a danger of these putting force on each other and that this could cause weighing errors. If four guide elements are used anyway, they should be installed with enough play to compensate. The guide elements should correspond with the principles used in the weighing technology. Ball-pin guides for up to 1000 kN transverse force are also available upon request. Document-No.: A5E00295975A Page 8 Revision 11/12 General Conditions for Installation and Assembly Fig. 1-3 Guide Positioning Document-No.: A5E00295975A Page 9 Revision 11/12 1.4 General Conditions for Installation and Assembly Load Cell Dummies Load cells are sensitive sensors. To protect them from damage, they should only be handled as late as possible for installation and transport. During installation and transport, these should be replaced by dummies or phantoms. Dummies can be constructed as follows for example: 1. A replica of the mounting element using a welded construction. A pipe or any other steel profile can be welded between two plates with the respective hole format for the fastening bolts. The overall height corresponds with the installation height of the mounting element. This is the most stable and secure version. Rough assembly work can be performed. 2. Using a SIWAREX R Combi-mounting unit. The Combi-mounting units are supplied as completely assembled units. The units are set at the approximate installation height for an operational unit. Slight adjustments can be made during the installation. 1.5 Load Cell Handling DANGER Load cells and mounting units are not machine elements that are constructed using standard safety factors. It is therefore absolutely necessary to prepare for the potential danger with respective supports or other means of protection. CAUTION To protect against undesirable electrical current, such as static discharge that can occur during welding or which can be caused by lighting for example, the load cells should be bridged with highly flexible grounding cable (e.g. SIWAREX R ground cable 7MH3 701-1AA1). SIWAREX R load cells may only be installed and connected by qualified personnel. Load cells are precision components and are to be handled carefully. Pay special attention during transport and assembly. CAUTION Mechanical jolts or dropping could irreparably damage the load cells. Load cells are not to be carried by their connecting cables. Document-No.: A5E00295975A Page 10 Revision 11/12 General Conditions for Installation and Assembly Loads must be introduced precisely in the direction of measurement of the load cells. Torsion and bending moments, off-center loading and transverse loads are disturbance forces that lead to incorrect measurements and can cause damage if exceeding the permitted limitations of the load cells and mounting elements. The mounting components allow enough play in movement that thermal expansion does not lead to transverse loading. 1.6 Welding and Installation Work As long as installation work is not complete on the scale, the load cells should be replaced with dummies to protect them from jolts or welding current. CAUTION If welding is required after installing the load cells, make absolutely sure that the welding current is not routed through the load cells. The ground clamp of the welder is to be securely connected in the direct vicinity of the point to be welded. The load cells must be bridged with a ground cable. The individual load cells are to be disconnected. The free cable ends should be insulated. 1.7 Mounting Load cells are never to be overloaded. Slowly put the load platform on. Especially with load cells having lower nominal loads, there is a danger that external forces during installation, e.g. tightening counter nuts, will bend the load cell bodies. WARNING Proper tools are to be used for lifting the load platform. Ensure that the respective safety regulations are followed. NOTE Molded brackets or eyebolts should exist on the loading platform for the proper utilization of lifting instruments. If overload security mechanisms are available, set them up so that the desire load can be taken on safely. They must permit an unrestricted increase in weight up to the set weight. The gap between the load cell and the overload protection is to be guarded from contamination and icing. Overload protection is to be checked regularly during maintenance work for easy adjustment. Document-No.: A5E00295975A Page 11 Revision 11/12 General Conditions for Installation and Assembly DANGER Contaminated, icy or incorrectly set overload protection will create blockages which cause incorrect measurements or can cause injury or damage to the machinery by overloading the scale. CAUTION Proper assembly and installation of load cells and mounting elements is to be ensured by checking the assembly dimensions and freedom of movement for example. Incorrect assembly can cause damage to load cells and mounting elements. Ensure that the cable is not damaged, disconnected or separated. Wrap and hang the cable in a loop hanging down on vertical cable mounts to divert any moisture away from connections. 1.8 Installation Surfaces The following conditions are to be met for mounting element installation surfaces: The position and slope deviation of the installation surfaces to one-another should correspond with the general tolerances for welded constructions, EN ISO 13920. The foundation must be absolutely solid and unable to sink. Level steel plates should be cast in cement foundations upon which the mounting elements are mounted. The anchorage points must be perpendicular to the direction of measurement and should preferably all be at the same level. If there are more than three mounting points, then the suspension is normally statically indeterminate. It is inevitable that the load will not be evenly distributed over all load cells on a stiff foundation with stiff loading platforms. Two diagonally positioned load cells support the main load. The other cells only support the load platform. There are two ways to handle this problem: 1. By over-dimensioning the load cells The nominal load of the load cells is calculated so that the overall weight can be supported on two load cells using four mounting points for example. This will also prevent load cell overloading if there is a possibility of the foundation sinking. Document-No.: A5E00295975A Page 12 Revision 11/12 General Conditions for Installation and Assembly 2. Mounting point height adjustment The output signals of all load cells are determined one after the other when they are loaded. In order to achieve similar loading on all of them, spacer plates are used to adjust the height. The spacer plates are pushed in between the brackets and the head plate of the mounting element for the best results. The output signals of the individual load cells correspond with load distribution. The output signals are measured as follows: Disconnect load cell lines SIG+ and SIG-. Supply the load cells with the supply voltage (e.g. 10.2V). Measure the output voltage between SIG+ and SIG- on each individual load cell. Now put spacer plates under the brackets for the load cell with the lowest value until the output voltages match. The load cell seat must be horizontal, level over the full-coverage and like the load cell underside, absolutely clean. The contact surface that introduces the force is to be coated with high-performance grease. 1.10 Dismantling When dismantling the load cells, the same safety and security measures are to be followed as for the installation and assembly. All power supply lines are to be switched off. Secure the load platform from falling. User appropriate lifting mechanisms and tools. Take all load off of the load cells and carefully remove them without any excessive force (no jolting movements). Do not cut the cable if the load cells are to be used again or if being sent in for repair. To not step on or pull on the cable for moving the load cells. 1.11 Explosion Protection There is no danger of explosion caused by the mounting elements of the load cells and therefore they are not subject to the EC Directive 94/9 EG (ATEX). Document-No.: A5E00295975A Page 13 2 Elastomer Bearing 2.1 Technical Description 2.1.1 Application Range The elastomer bearing is used for protecting the load cells if there is the possibility of having to deal with jolts or oscillation. This has a self-centering effect on the load platform. In combination with the base plate, this is a simple solution for load cell assembly. The BB 10 - 200 kg elastomer bearing is rigidly attached to the load cell and the loading platform. It also provides limited lifting security. 2.1.2 Construction 2.1.2.1 Elastomer Bearing Construction BB 10 - 200 kg A complete elastomer bearing unit BB 10 - 200 kg consists of basic order-components base plate with overload protection, load cell and elastomer bearing. The base plate (1) is bolted to the foundation with four bolts. The load cell (3) is fastened to the base plate (1) with two hexagon bolts (5) and the spacer bar (2). The elastomer bearing (10) is affixed to the load cell (3) with a hexagon bolt (8). The elastomer bearing (10) is bolted to the load platform. The load platform is centered with the elastomer bearing (10) this way. Transverse movement of the load platform is permitted to a certain degree. The measurement path of the load cell (3) is limited by the adjustable overload security mechanism (7). This protects from accidental damage caused by overloading. The elastomer bearing (10) is a rubber-metal combination made of neoprene and stainless steel. No. Designation No. Designation 1 Base plate 6 Nut 2 Spacer bar 7 Overload protection 3 Load cell 8 Hexagon head screw 4 Washer 9 Washer 5 Hexagon head screw 10 Elastomer bearing Fig. 2-1 Construction Elastomer Bearing BB 10 - 200 kg Document-No.: A5E00295975A Page 14 Revision 11/12 2.1.2.2 Elastomer bearing Construction Elastomer Bearing BB 350 / 500 kg A complete elastomer bearing unit consists of basic order-components base plate with overload protection, load cell, oscillation housing and elastomer bearing. The base plate (1) is bolted to the foundation with four bolts. The load cell (3) is fastened to the base plate with two Allen Screws (5) and the spacer bar (2). The oscillation housing (9) is put in the load cell (3) and is secured with a retaining ring (8). The elastomer bearing (12) is seated with the oscillation bolts as force transmission mechanism (11) in the oscillation housing (9) and is bolted to the load platform. The elastomer bearing (12), and therefore the load platform as well, is centered with the force transmission mechanism (11). Transverse movement of the load platform is permitted to a certain degree. A flat seal (10) between the elastomer bearing (12) and the oscillation housing (9) protect the force transmission mechanism from any contamination. The measurement path of the load cell (3) is limited by the adjustable overload security mechanism (7). This protects from accidental damage caused by overloading. The elastomer bearing is a rubber-metal combination made of neoprene and stainless steel. No. 1 2 3 4 5 6 Designation Base plate Spacer bar Load cell Washer Cylinder head screw Nut No. 7 8 9 10 11 12 Designation Overload protection Retaining ring Oscillation housing Flat seal Force transmission Elastomer bearing Fig. 2-2 Construction Elastomer Bearing BB 350 / 500 kg Document-No.: A5E00295975A Page 15 Revision 11/12 2.2 Elastomer bearing Assembly The conditions for installation are very different. The load platform can be very low or relatively high. It could be a container, a platform or a conveyor for example. The following assembly instructions can only be taken as general guidelines. WARNING Proper tools are to be used for lifting the load platform. Ensure that the respective safety regulations are followed. The load platform should always be built on dummies to begin with, so that the load cells are protected from damages during assembly. The load platform must then only be lifted a few millimeters from bracket to bracket to position the elastomer bearing. The following description of assembly procedures is based on this situation. 2.2.1 Assembly Elastomer Bearing BB 10 - 200 kg Assembly procedures: (Numbering see Fig 2-3) 1. Load cell preparation: A data sheet is supplied with every load cell with the calibration values for that load cell. This is found in a supply pocket which is stuck on the packaging. Take the data sheet and store it in a safe place. Unpack the load cell. 2. Base plate preparation: Unpack the base plate. 3. Elastomer bearing preparation: Unpack the elastomer bearing (10). 4. Assemble the elastomer bearing unit: NOTE Please follow the guidelines from chapter 1.5 Load Cell Handling when working with load cells. CAUTION An incorrect or incomplete assembly can result in damaging load cells, mounting components and the loading platform. DANGER A falling loading platform can result in death, severe injury or damage to equipment depending on exposure. Document-No.: A5E00295975A Page 16 Revision 11/12 Elastomer bearing Bolt the elastomer bearing (10) to the load cell (3) with the hexagon bolt (8) and the washer (9). Hold the elastomer bearing (10) down when tightening the hexagon bolt (8) to prevent damage being done to the load cell. The arrow on the front of the load cell indicates the direction of measurement. Lie the spacer bar (2) on the base plate (1) so that both holes are aligned with the threaded holes in the base plate (1) and so that it is even. The spacer bar (2) is asymmetrical. Put the load cell (3) on the spacer bar (2) using 2x hexagon bolts (5) and 2x washers (4). Tighten the 2x hexagon bolts (5) to 23 Nm torque. Do not use the load cell as leverage when tightening the bolts as this can cause damage to the load cell. 5. Install the elastomer bearing unit: Loosen the bolts on the dummies Lift the loading platform from the first bracket and remove the dummy. Install the elastomer bearing unit and screw the bolts in loosely. Slowly lower the loading platform. Install the remaining elastomer bearing units as described. Ensure that the elastomer bearings are not under tension. Tighten the fastening bolts. Document-No.: A5E00295975A Page 17 Revision 11/12 Elastomer bearing Fig. 2-3 Assembly Elastomer Bearing BB 10 - 200 kg 6. Setting the overload protection: Load the loading platform with the maximum applicable load. Set the overload protection mechanism (7) in connection with the nut (6) to 0.05 - 0.1 mm, see dimension X in Fig. 2-4. Dimension X must exist after tightening the nut (6) as well. Fig. 2-4 Setting up the overload protection Document-No.: A5E00295975A Page 18 Revision 11/12 Elastomer bearing DANGER Contaminated, icy or incorrectly set overload protection will create blockages which cause incorrect measurements or can cause injury or damage to the machinery by overloading the scale. 2.2.2 Assembly Elastomer Bearing BB 350 / 500 kg Assembly procedures: (Numbering see Fig. 2-5) 1. Load cell preparation: A data sheet is supplied with every load cell with the calibration values for that load cell. This is found in a supply pocket which is stuck on the packaging. Take the data sheet and store it in a safe place. Unpack the load cell. 2. Base plate preparation: Unpack the base plate. 3. Elastomer bearing preparation: Unpack the elastomer bearing (12). Check that the flat seal is properly seated on the elastomer bearing. 4. Oscillation housing preparations: Unpack the oscillation housing (9). Remove the retaining ring (8) from the oscillation housing. 5. Assemble the elastomer bearing unit: NOTE Please follow the guidelines from chapter 1.5 Load Cell Handling when working with load cells. CAUTION An incorrect or incomplete assembly can result in damaging load cells, mounting components and the loading platform. DANGER A falling loading platform can result in death, severe injury or damage to equipment depending on exposure. Insert the oscillation housing (9) into the load cell (3). The arrow on the front of the load cell indicates the direction of measurement. Install the retaining ring (8) in the groove in the oscillation housing (9). Lie the spacer bar (2) on the base plate (1) so that both holes are aligned with the threaded holes in the base plate (1). Put the load cell (3) on the spacer bar (2) using 2x Allen screws (5) and 2x washers (4). Tighten the 2x Allen screws (5) to 70 Nm torque. Do not use the load cell as leverage when tightening the bolts as this can cause damage to the load cell. Smear the round surface of the force transmission for the elastomer bearing (12) with bearing grease and install it in the oscillation housing (9). Document-No.: A5E00295975A Page 19 Revision 11/12 Elastomer bearing 6. Install the elastomer bearing unit: Loosen the bolts on the dummies Lift the loading platform from the first bracket and remove the dummy. Install the elastomer bearing unit and screw the bolts in loosely. Slowly lower the loading platform. Install the remaining elastomer bearing units as described. Ensure that the elastomer bearings are not under tension. Tighten the fastening bolts. Fig. 2-5 Assembly Elastomer Bearing BB 350 / 500 kg Document-No.: A5E00295975A Page 20 Revision 11/12 Elastomer bearing 7. Setting the overload protection: Load the loading platform with the maximum applicable load. Set the overload protection mechanism (7) in connection with the nut (6) to 0.05 - 0.1 mm, see dimension X, Fig. 2-6, is. Dimension X must also exist after tightening the nut (6). Fig. 2-6 Setting the Overload Protection DANGER Contaminated, icy or incorrectly set overload protection will create blockages which cause incorrect measurements or can cause injury or damage to the machinery by overloading the scale. 2.3 Technical Data 2.3.1 Function Data Nominal load Permitted transverse movement Document-No.: A5E00295975A 10 kg - 200 kg 4 mm 350 / 500 kg 4 mm Page 21 Revision 11/12 Elastomer bearing 2.3.2 Dimensions Fig. 2-7 Dimensions BB 10 - 200 kg Document-No.: A5E00295975A Page 22 Revision 11/12 Elastomer bearing Fig. 2-8 Dimensions BB 350 / 500 kg Document-No.: A5E00295975A Page 23 Revision 11/12 2.4 Elastomer bearing Care and Maintenance General The physical properties of most rubber goods will change in adverse conditions or if improperly handled. Rubber components can become unusable when it becomes too soft or too hard, gets deformed or cracks, peels or has any other surface damage. The changes can be caused by the effects of e.g. ozone, heat, light, humidity, solvent or long periods of tension. If properly handled and stored, rubber products will retain the effective properties over a long period of time (several years). Service life and Inspections The service life of elastomer components depends on the type and the load. Rubber undergoes a natural aging process. With loads that are within the permitted range, a service life of over 6 years can be expected. The rubber-metal components are maintenance-free during operation. The round surface of the oscillation bolt is to be greased if necessary. A visual inspection of the components should be performed 6 months after installation and once per year thereafter. Checking the bond between the rubber and metal can be done using a manual mechanical bond test. This is done by pressing the rubber back with a blunt "test-iron" (pressure ridge with arc). If portions of the rubber surface are coming apart in the bonding zone between the elastomer and the metal or if surface cracks appear in the individual elastomer layers, observe those areas (in intervals). Replacement A replacement is necessary if: if 70% of the initial rubber thickness is achieved through setting and loading, if the weather has caused visible cracking over cm2 rubber surface, the item is excessively swollen due to undue oil seepage, the rubber-metal bond is breaking down, mechanical damage resulting from the sensitivity of the rubber leading to further damage to the product is present. Cleaning Cleaning solutions with a neutral pH value are recommended and covalent cleaning solvents such as gasoline for example are not to be used under any circumstances. Components should be rinsed with water after cleaning in certain cases. Otherwise the rubber-metal bond is to be protected from cleaning solvents using constructive means. The use of sharp or jagged objects, wire brushes or abrasive paper products is not permitted. The flat seal may not be subjected to direct streams of water. The round surface of the oscillation bolt is to be re-greased when necessary. The overload protection mechanism is to be checked for any contamination. Document-No.: A5E00295975A Page 24 Revision 11/12 2.5 Elastomer bearing Ordering Data Elastomer bearing for load cells with a nominal load of 10 - 50 kg 100 - 200 kg 350 / 500 kg Order number Elastomer bearing 7MH4 133-2KE11 7MH4 133-3DE11 7MH4 130-4AE11 Order number Base plate 7MH4 133-3DG11 7MH4 133-3DG11 7MH4 133-3KG11 Order number Oscillation housing 7MH4 133-3KP11 In the order numbers above, the load cells are not included. Document-No.: A5E00295975A Page 25 3 Combi-Mounting Unit 3.1 Technical Description 3.1.1 Application Range Combi-mounting units are for direct force transmission to the load cells. These are self-centering on the load platform. The combi-mounting units have the following features: Integrated oscillation limitation. Integrated lift protection with the BB 10 - 200 kg. Can be used as dummy for light assembly work. Slow, controlled lowering of the head plate. Can be used as transit security by affixing the head plate to protect the load cells. 3.1.2 Construction 3.1.2.1 Construction Combi-Mounting Unit BB 10 - 200 kg The combi-mounting unit consists of the base and head plates and two countersinking bolts as oscillation limiters and lift protection. Combined with the load cell, it is a multifunctional storage unit. The base plate (1) is bolted to the foundation with four bolts. The load cell (3) is fastened to the base plate (1) with two hexagon bolts (5) and a spacer bar (2). An oscillation housing (12) is inserted in the head of the load cell (3). The oscillation bolt (16) positioned in it. The oscillation bolt is supported by to pressure pieces (13) and (15). Both pressure pieces (13) and (15) are bonded in the oscillation housing (12) and the head plate (17). The head plate (17) is supported on the oscillation bolt (16). The head plate (17) is bolted to the loading platform. The loading platform is centered with the oscillation bolt (16). Transverse movement of the load platform causes a response that puts the load platform back in the rest position. The counter-sunk bolts (8) limit the possible movement of the head plate (17). Their second function is to prevent the head plate from being lifted. A flat seal (14) between the oscillation housing (12) and the head plate (17) protects the force transmission mechanism from contamination. The base plate is equipped with an adjustable overload protection mechanism (10). This limits the measurement path of the load cell (3) and protects the equipment from any damages that might be caused by accidental overloading. (Numbering see Fig. 3-1) Document-No.: A5E00295975A Page 26 Revision 11/12 Combi-Mounting Units No. 1 2 3 4 5 6 7 8 9 Designation Base plate Spacer bar Load cell Washer Hexagon head screw Nut Half-nut Countersunk screw Nut No. 10 11 12 13 14 15 16 17 Designation Overload protection Retaining ring Oscillation housing Pressure piece Flat seal Pressure piece Oscillation bolt Head plate Fig. 3-1 Construction Combi-Mounting Unit BB 10 - 200 kg 3.1.2.2 Combi-Mounting Unit BB 350 / 500 kg The combi-mounting unit consists of the base and head plates and two countersinking bolts as oscillation limiters and lift protection. Combined with the load cell, it is a multifunctional storage unit. The base plate (1) is bolted to the foundation with four bolts. The load cell (3) is fastened onto the base plate (1) with two Allen screws (5) and a spacer bar (2). A pressure piece (9) is inserted into the head of the load cell (3). The ball (10) is inserted into this. The ball is supported against a second pressure piece (11) which is bonded in the head plate (12). The head plate (12) is bolted to the loading platform. The loading platform is centered with the ball (10). Transverse movement of the load platform causes a response that puts the load platform back into the rest position. The counter-sunk bolts (15) limit the possible movement of the head plate (12). Their second function is to prevent the head plate from being lifted. (Numbering see Fig. 3-2) Document-No.: A5E00295975A Page 27 Revision 11/12 Combi-Mounting Units No. 1 2 3 4 5 6 7 8 Designation Base plate Spacer bar Load cell Washer Cylinder head screw Ground cable Hexagon head screw Washer No. 9 10 11 12 13 14 15 Designation Pressure piece load cell Ball Pressure piece head plate Head plate Nut Washer Countersunk screw Fig. 3-2 Construction Combi-Mounting Unit BB 350 / 500 kg 3.2 Assembly 3.2.1 Assembly Combi-Mounting Unit BB10 - 200 kg The conditions for installation are very different. The load platform can be very low or relatively high. It could be a container, a platform or a conveyor for example. The following assembly instructions can only be taken as general guidelines. WARNING Proper tools are to be used for lifting the load platform. Ensure that the respective safety regulations are followed. The load platform should always be built on dummies to begin with, so that the load cells are protected from damages during assembly. The load platform must then only be lifted a few millimeters from bracket to bracket to position the combi-mounting unit. The following description of assembly is based on this situation. Document-No.: A5E00295975A Page 28 Revision 11/12 Combi-Mounting Units Assembly procedures: (Numbering see Fig. 3-3) 1. 2. Load cell preparation: A data sheet is supplied with every load cell with the calibration values for that load cell. This is found in a supply pocket which is stuck on the packaging. Take the data sheet and store it in a safe place. Unpack the load cell. Combi-Mounting Unit preparation: NOTE The lifting path of the head plate (17) must be set from approximately 2 mm with the counter-sunk bolts (8), see dimension X in Fig. 3-5. Setting this lifting path is easier if performed before installing the load cell. The combi-mounting unit must be disassembled in order to install the load cell. The combi-mounting units are pre-assembled before delivery. Adjust the head plate (17) using the two counter-sunk bolts (8) and the two nuts (7) to: functional installation height + lifting path = installation height 80 mm 2 mm 82 mm These preparations and following the handling procedures as described in the following prevent any extra work in adjusting later. When using the combi-mounting units as dummies, this 2 mm must also be taken into account or it can be adjusted later. 3. Unpack the combi-mounting unit. Scope of delivery: - Combi-Mounting Unit, assembled - Oscillation bolt (16) - Oscillation housing (12) with flat seal (14) Set the lifting path for the head plate (17) as described above. Install the top nuts (7) onto the lower nuts (6) and tighten. Loosen the lower nuts and unscrew the counter-sunk bolt (8) from the base plate (1). Leave the counter-sunk bolt (8) in the head plate (17), do not loosen the nuts (6) and (7) put the head plate (17) to the side. Check the flat seal (14) for proper seating. Smear the ball surface of the oscillation bolt (16) with bearing grease. Assemble the Combi-Mounting Unit: NOTE Please follow the guidelines from chapter 1.5 Load Cell Handling when working with load cells. CAUTION An incorrect or incomplete assembly can result in damaging load cells, mounting components and the loading platform. Document-No.: A5E00295975A Page 29 Revision 11/12 Combi-Mounting Units DANGER A falling loading platform can result in death, severe injury or damage to equipment depending on exposure. Insert the oscillation housing (12) into the load cell (3). The arrow on the front of the load cell indicates the direction of measurement. Install the retaining ring (11) in the groove of the oscillation housing (12). Lie the spacer bar (2) on the base plate (1) so that both holes are aligned with the threaded holes in the base plate (1) and so that it is even. The spacer bar (2) is asymmetrical. Put the load cell (3) on the spacer bar (2) using 2x hexagon bolts (5) and 2x washers (4). Tighten the 2x hexagon bolts (5) to 23 Nm torque. Do not use the load cell as leverage when tightening the bolts as this can cause damage to the load cell. Smear the ball surface of the oscillation bolt (16) with bearing grease and insert it into the oscillation housing (12). Set the head plate (17) on the oscillation bolt (16). Screw the counter-sunk bolt (8) into the base plate (1) and tighten the lower nut (6). Loosen nut (7) from nut (6), turn it upwards on the threads and tighten against the head plate (17). This optimally centers the head plate over the base plate, pressure is relieved on the load cell and it is protected against overloading during the installation. Document-No.: A5E00295975A Page 30 Revision 11/12 Combi-Mounting Units Fig. 3-3 Assembly Combi-Mounting Unit BB 10 - 200 kg 4. Installing the Combi-Mounting Unit: Loosen the bolts on the dummies. Lift the loading platform from the first bracket and remove the dummy. Set the combi-mounting unit in place and loosely install the fastening bolts. Slowly lower the loading platform. Install the remaining combi-mounting units as described. Tighten the fastening bolts. Loosen the nuts (7) and slowly lower the head plate (17). Turn nut (7) to nut (6) and tighten. Document-No.: A5E00295975A Page 31 Revision 11/12 5. Combi-Mounting Units Setting the overload protection: Load the loading platform with the maximum applicable load. Set the overload protection mechanism (10) in connection with the nut (9) to 0.05 - 0.1 mm, see dimension X in Fig. 3-4. Dimension X must also exist after tightening the nut (9). Fig. 3-4 Setting the overload protection DANGER Contaminated, icy or incorrectly set overload protection will create blockages which cause incorrect measurements or can cause injury or damage to the machinery by overloading the scale. 5. Assembly Inspection: The loading platform must be able to swing freely. The counter-sunk bolts (8) should be as close as possible to the center in the holes of the head plate (17). The head plate therefore has optimal freedom of movement on all sides and no secondary forces can be Fig. 3-5 Overload Protection and generated. Oscillation Limitation The counter-sunk bolts (8) must not protrude past the head plate (17). DANGER Incorrectly adjusted counter-sunk bolts cause blockages which in turn result in incorrect measurements or can lead to overloading the scale and damage to equipment or injury to persons. 3.2.2 Combi-Mounting Unit BB 350 / 500 kg Assembly procedures: (Numbering see Fig. 3-7) 1. Load cell preparation: A data sheet is supplied with every load cell with the calibration values for that load cell. This is found in a supply pocket which is stuck on the packaging. Take the data sheet and store it in a safe place. Unpack the load cell. Document-No.: A5E00295975A Page 32 Revision 11/12 2. Combi-Mounting Units Combi-Mounting Unit preparation: NOTE The lifting distance of the head plate (12) must be set to approximately 3 mm, see dimension X in Fig. 3.8. Setting this lifting distance is easier if performed before installing the load cell. The combi-mounting unit must be disassembled in order to install the load cell. The combi-mounting units are pre-assembled before delivery. Adjust the head plate (12) using the two counter-sunk bolts (15) and the two upper nuts (13) to: functional installation height + lifting distance = installation height 73 mm 3 mm 76 mm These preparations and following the handling procedures as described in the following prevent any extra work in adjusting later. When using the combi-mounting units as dummies, this 3 mm of extra height is to be taken into account or it can be adjusted later. 3. Unpack the combi-mounting unit. Scope of delivery: - Combi-Mounting Unit, assembled - Pressure pieces (9) - Ball (11) Set the lifting distance of the head plate (12) as described above. Turn the upper nut (13) to the lower nut (13) and tighten. Loosen the lower nut (13) and remove the counter-sunk bolt (15) from the base plate (1). Leave the counter-sunk bolt (15) in the head plate (12), do not loosen the nuts (13) and put the head plate (12) to the side. Assemble the Combi-Mounting Unit: NOTE Please follow the guidelines on handling load cells in chapter 1.5 Load Cell Handling. CAUTION Incorrect or incomplete assemblies can lead to damages to the load cells, mounting units and the loading platform. DANGER A falling loading platform can result in death, severe injury or damage to equipment depending on exposure. Lie the spacer bar (2) on the base plate (1) so that both holes are aligned with the threaded holes in the base plate (1) and so that it is even. The spacer bar (2) is asymmetrical. Document-No.: A5E00295975A Page 33 Revision 11/12 Combi-Mounting Units Put the load cell (3) on the spacer bar (2) using 2x Allen screws (5) and 2x washers (4). The arrow on the front of the load cell indicates the direction of measurement, see Fig. 3-6. Tighten the 2x Allen screws (5) to 70 Nm torque. Do not use the load cell as leverage when tightening the bolts since this could damage the load cell. Insert the pressure piece (9) in the Fig. 3-6 Installation Position load cell. Load Cell Smear the ball (10) with bearing grease and insert it into the pressure piece (9). Set the head plate (12) on the ball (10). Screw the counter-sunk bolt (15) into the base plate (1) and tighten the lower nuts (13). Loosen the upper nut (13) from the lower nut (13), turn it upward and tighten against the head plate (12). This optimally centers the head plate over the base plate, pressure is relieved on the load cell and it is protected against overloading during the installation. Fig 3-7 Assembly Combi-Mounting Unit BB 350 / 500 kg Document-No.: A5E00295975A Page 34 Revision 11/12 4. 5. Combi-Mounting Units Installing the Combi-Mounting Unit: Loosen the bolts on the dummies. Lift the loading platform from the first bracket and remove the dummy. Set the combi-mounting unit in place and loosely install the fastening bolts. Slowly lower the loading platform. Install the remaining combi-mounting units as described. Tighten the fastening bolts. Loosen the upper nuts (13) and slowly lower the head plate (12). Turn the upper nuts (13) to the lower nuts (13) and tighten. Assembly Inspection: The loading platform must be able to swing freely. The counter-sunk bolts (15) should be positioned as close to the middle of the holes in the head plate (12) as possible. The head plate therefore has optimal freedom of movement on all sides and no secondary forces can be generated. The counter-sunk bolts (15) are not permitted to protrude past the head plate (12). Fig. 3-8 Overload Protection and Oscillation Limitation DANGER Incorrectly adjusted counter-sunk bolts cause blockages which in turn result in incorrect measurements or can lead to overloading the scale and damage to equipment or injury to persons. 3.3 Technical Data 3.3.1 Function Data Nominal load Permitted Transverse Movement: Lifting distance of the head plate Max. Transverse Force Max. lifting force Document-No.: A5E00295975A 10 - 200 kg 2 mm 2 - 2.5 mm 1,7 kN 2,5 kN 350 / 500 kg 2.5 mm 3.5 - 3 mm 2,5 kN 2,5 kN Page 35 Revision 11/12 Combi-Mounting Units 3.3.2 Dimensions Fig. 3-9 Dimensions Combi-Mounting Unit BB 10 - 200 kg Document-No.: A5E00295975A Page 36 Revision 11/12 Combi-Mounting Units Fig. 3-10 Dimensions Combi-Mounting Unit BB 350 / 500 kg Document-No.: A5E00295975A Page 37 Revision 11/12 3.4 Combi-Mounting Units Care and Maintenance Combi-mounting units are to be inspected depending on the environmental conditions. If there is a high degree of dust, contamination, humidity etc., the maintenance intervals are to be chosen respectively. These are to be kept free of course contamination. The flat seal may not be subjected to direct streams of water. The round surfaces of the oscillation bolts are to be greased when necessary. The overload protection mechanism should be inspected for contamination. 3.5 Ordering Data Combi-mounting units for Order number load cells with a nominal load of 10 - 200 kg 7MH4 133-3DC11 350 / 500 kg 7MH4 133-3KC11 In the order numbers above, the load cells are not included. Document-No.: A5E00295975A Page 38 4 Ground cable 4.1 Technical Description 4.1.1. Application Range The ground cable is used for protecting the load cells from unwanted currents. These currents could be cause by e.g.: as equalization currents for missing or faulty, voltage equalization lines, a lightning bolt in the vicinity, welding or static discharge. The ground cable is an electrical shunt for the load cell and mounting unit. High welding currents can damage load cells, mounting units or the electronics. Voltage spikes from static discharge can damage the electronics. Fig. 4-1 Application example Ground Cable 4.1.2 Construction The ground cable consists of a fine-strand copper wire with a cross-section of 50 mm2 and two eyelets, O 10mm. 4.2 Assembly A permanent screw-contact is to be made for fastening the ground cable, e.g. M10, on the loading platform and the foundation. Document-No.: A5E00295975A Page 39 Revision 11/12 4.3 Ground cable Dimensions Fig. 4-2 Dimensions Ground Cable 4.4 Care and Maintenance The connections of the cable are to be inspected regularly for corrosion and conductivity. 4.5 Ordering Data Designation Ground cable Document-No.: A5E00295975A Order number 7MH3 701-1AA1 Page 40