Table of contents
1LA5/6/7/9, 1LG4/6, 1MA6/7, 1MB..1/2/3/4 - AH 63 ... 355
Operating Instructions, 12/2018, A5E44455710A 5
5.3.1 Repainting/touching up the paint finish of explosion-protected machines.............................. 62
5.3.2 Measures for alignment and mounting ................................................................................... 62
5.3.3 Flatness of the supporting surfaces for conventional motors ................................................. 63
5.3.4 Machine frame mounting feet (special design) ....................................................................... 63
5.4 Installing the machine ............................................................................................................. 63
5.4.1 Preconditions for smooth, vibration-free operation ................................................................. 63
5.4.2 Aligning the machine to the driven machine and mounting .................................................... 64
5.4.2.1 Selecting bolts ......................................................................................................................... 64
5.4.2.2 Horizontal types of construction with mounting feet ............................................................... 64
5.4.2.3 Horizontal types of construction with flange ........................................................................... 64
5.4.2.4 Vertical types of construction with flange................................................................................ 65
5.4.3 Removing the rotor shipping brace ......................................................................................... 66
5.4.4 Recommended alignment accuracy ....................................................................................... 66
5.4.5 Mounting the output elements ................................................................................................ 67
5.4.6 Axial and radial forces............................................................................................................. 68
6 Electrical connection ............................................................................................................................. 69
6.1 Connecting the machine ......................................................................................................... 70
6.1.1 Selecting cables ...................................................................................................................... 70
6.1.2 Terminal box ........................................................................................................................... 72
6.1.2.1 Terminal marking .................................................................................................................... 72
6.1.2.2 Circuit diagram inside the terminal box cover ......................................................................... 73
6.1.2.3 Direction of rotation ................................................................................................................. 73
6.1.2.4 Knockout openings ................................................................................................................. 73
6.1.2.5 Cable entry .............................................................................................................................. 74
6.1.2.6 Protruding connection cables ................................................................................................. 75
6.1.2.7 Connecting protruding cables ................................................................................................. 75
6.1.2.8 Connection with/without cable lugs ......................................................................................... 76
6.1.2.9 Thread sizes in the terminal box ............................................................................................. 76
6.1.2.10 Minimum air clearances .......................................................................................................... 77
6.1.2.11 Internal equipotential bonding ................................................................................................. 77
6.1.3 Cable glands ........................................................................................................................... 77
6.1.3.1 Mounting position of sheet metal nuts in screw-type connections ......................................... 78
6.2 Tightening torques .................................................................................................................. 79
6.2.1 Cable entries, sealing plugs and thread adapters .................................................................. 79
6.3 Connecting the grounding conductor ...................................................................................... 79
6.3.1 Minimum surface area of grounding conductor ...................................................................... 79
6.3.2 Grounding connection type ..................................................................................................... 80
6.4 Connecting the temperature sensor/anti-condensation heater .............................................. 81
6.4.1 Connecting optional integrated devices and equipment ......................................................... 81
6.5 Conductor connection ............................................................................................................. 82
6.5.1 1MB.. ....................................................................................................................................... 83
6.5.2 Cable ends with wire end sleeves .......................................................................................... 85
6.5.3 Connecting aluminum conductors .......................................................................................... 85
6.6 Connecting the converter ........................................................................................................ 86
6.7 Final checks ............................................................................................................................ 88
7 Commissioning ..................................................................................................................................... 89
7.1 Measures before commissioning ............................................................................................ 89