14
XS5/XS6 Industrial Ethernet Cables
■Assembly Procedure
●RJ45 Assembly Connectors
XS6G-T421-1
1. Pass the cable through the cable
clamp and the connector housing
2. Strip the cable sheath and ground
braiding to the correct lengths.
3. Follow the color codes and prepare
to insert the wires into the splice
piece.
4. Insert the wires into the splice piece
for the length of the splice piece.
5. Place the splice piece into the RJ45
data module and engage it.
6. Place the data module and the
splice piece on the IDC assembly
housing.
7. Press the data module and the IDC
assembly housing together and use
pliers or a similar device to make
the insulation displacement contact.
8. Remove the data module from the
IDC assembly housing.
9. Place the upper screen plate on the
data module and press it over the
ground braiding of the cable.
10. Place the lower screen plate on the
bottom of the data module, align it
with the upper screen place, and
latch it until you hear it click into
place.
11. Slide the housing that you placed
around the cable in step 1 up to the
data module and latch it until you
hear it click into place.
12. Tighten the cable clamp.
Pin Assignments
Pin Assignments for Fast Ethernet 10/100 Mbps
●M12 Panel-mounting PCB Straight Terminals
XS5P-T426-1
Confirming the Number of Parts
The following four parts are included in the package when it is
delivered.
Assembly Procedure
1. Mount the connector to the PCB.
2. Attach the anchor to the panel with the nut.
3. Attach the connector that you mounted to the PCB to the panel.
* Make sure that the connector and anchor are oriented correctly.
4. Temporarily mount the O-ring to the top of the connector at the
mating surface.
5. Mate the Connector Waterproof Cover (XS2Z-22, sold sepa-
rately) or the Partner Connector Plug (XS5H-T42@-@M0-K,
sold separately) and press the O-ring to the O-ring position
after mounting.
●Connector Waterproof Cover (Sold Separately)
XS2Z-22
Function/Signal
Wire color
Pin No.
Industrial
Ethernet
EIA/TIA
568A
EIA/TIA
568B
Transmission Data+/TD+ YE WH/GN WH/OG 1
Transmission Data-/TD−OG GN OG 2
Receiver Data/RD+ WHWH/OG WH3
Receiver Data/RD−BU OG GN 6
Panel-mounting Parts PCB-mounting Part
1. Anchor 2. O-Ring 3. Nut 4. Connector
Mounting the Connector to the PCB Mounting the Anchor to the Panel
PCB
Anchor
Nut
*Tightening torque: 1 N·m
Panel
5 mm
Attachment
Align the flat surface on the anchor with
the grounding fixture terminal.
O-ring
Temporary Mounting
of the O-Ring
O-Ring Position after Mounting
Mounting the O-Ring
* Tightening torque: 0.39 to 0.49 N·m